Problems
on Time and Work
Q.
1. A
completes a work in 12 days and B complete the same work in 24 days. If both of
them work together, then the number of days required to complete the work will
be
(a) 8 (b)
6 (c) 7 (d) 5
(e) None of these
Ans:
(a) 8
Explanation:
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
Therefore, here, the required number of days = 12 ×
24/ 36 = 8 days. Ans.
Q.
2. If
4 men can colour 48 m long cloth in 2
days, then 6 men can colour 36 m long cloth in
(a) 1
day (b) 1 ½ days (c) ¾ day
(d) ½ day (e) None of these
Ans:
(a) 1 day
Explanation:
The length of cloth painted by one man in one day =
48 / 4 × 2 = 6 m
No. of days required to paint 36 m cloth by 6 men =
36/ 6 × 6 = 1 day. Ans.
Q.
3. If
3 persons can do 3 times of a particular work in 3 days, then, 7 persons can do
7 times of that work in
(a) 7 days
(b) 6 days (c) 4 days (d) 3 days (e) None of these
Ans:
(d) 3 days.
Explanation:
That is, 1 person can do one time of the work in 3
days.
Therefore, 7 persons can do 7 times work in the same
3 days itself. Ans.
Q.
4. Mangala
completes a piece of work in 10 days, Raju completes the same work in 40 days.
If both of them work together, then the number of days required to complete the
work is
(a) 15 (b)
10 (c) 9 (d) 8
(e) None of these
Ans:
( d) 8
Explanation:
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
That is, the required No. of days = 10 × 40/50 = 8
days. Ans.
Q.
5. 12
men work 8 hours per day to complete the work in 10 days. To complete the same
work in 8 days, working 15 hours a day, the number of men required
(a) 4 (b)
5 (c) 6 (d) 8
(e) None of these
Ans:
(d) 8
Explanation:
That is, 1 work done
= 12 × 8 × 10
Then, 12
8
× 10 = ? × 15 × 8
? (i.e. No. of men required) = 12 × 8 × 10/15× 10 = 8 days. Ans.
Q.
6. If
5 people undertook a piece of
construction work and finished half the job in 15 days. If two people drop out,
then the job will be completed in
(a) 25 days (b) 20
days (c) 15 days (d) 10 days
(e) None of these
Ans: (a) 25 days
Explanation:
That is, half the work done = 5 × 15 × ½
Then, 5 × 15 × ½ = 3 × ?
×1/2
i.e. 5 × 15 = 3 × ?
therefore, ? (No. days required) = 5 × 15/3 = 25 days. Ans.
Q.
7. 30
labourers working 7 hours a day can finish a piece of work in 18 days. If the
labourers work 6 hours a day, then the number of labourers required to finish
the same piece of work in 30 days will be
(a) 15 (b) 21 (c) 25
(d) 22 (e) None of these
Ans: (b) 21
Explanation:
That is, 1 work done = 30 × 7 ×18 = ? × 6 × 30
? (No. of labourers) = 30 × 7 × 18/6 × 30
= 21. Ans.
Q.
8. If
5 girls can embroider a dress in 9 days, then the number of days taken by 3
girls will be
(a) 20 days
(b) 10 days (c) 14 days (d) 15 days (e) None of days
Ans:
(d) 15 days
Explanation:
That is, 5 ×
9 = 3 × ?
? = 5 × 9/3 = 15 days. Ans.
Q.
9. A
and B together can plough a field in 10 hours but by himself A requires 15
hours. How long would B take to plough the same field?
(a) 10 hours
(b) 20 hours (c) 30 hours (d) 40 hours (e) None of these
Ans:
(c) 30 hours
Explanation:
If
A and B together can do a piece of work in x days and A alone can do the same
work in y days, then B alone can do the same work in x y/ y – x days.
Therefore, the No. of hours required by B = 10 × 15/ 15 – 10 = 150/5 = 30 hours. Ans.
Q.
10. 16
men or 20 women can finish a work in 25 days. How many days 28 men and 15 women
will take to finish this job?
(a) 19 13/43
days (b) 11 27/43 days (c) 8 days (d) 10 days (e) None of these
Ans:
(d) 10 days
Explanation:
16 men = 20 women
Therefore, 1 women = 16/20 men = 4/5 men
15 women = 4/5 × 15 men = 12 men
i.e. 28 men + 15 women = 28 men + 12 men = 40men
1 work done by men = 16 × 25
16 × 25 = 40 × ?
? ( no. of days) = 16 × 25/40 = 10 days. Ans.
Q.
11. A
can do a piece of work in 5 days and B can do the same work in 10 days. How
many days will both take to complete the work?
(a) 5 days
(b) 3 1/3 days (c) 3 days (d) 6 days (e) None of these
Ans:
(b) 3 1/3 days
Explanation:
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
That is, the required No. of days = 5 × 10/15 = 3
1/3 days. Ans.
Q.
12. If
12 men can do a piece of work in 24 days, then in how many days can 18 men do
the same work?
(a) 36 (b)
20 (c) 18 (d) 16
(e) None of these
Ans:
(d) 16
Explanation:
1 work done = 12 × 24
Then, 12 × 24 = 18 × ? days
? days = 12 × 24/18 = 16. Ans.
Q.
13. A
group of workers accepted to do a piece of work in 25 days. If 6 of them did
not turn for the work and the remaining workers did the work in 40 days, then
the original number of workers was
(a) 22 (b)
20 (c) 18 (d) 16
(e) None of these
Ans:
(d) 16
Explanation:
Let the original number of workers be ‘x’
Then, x × 25
= (x – 6) × 40
25x
= 40x -240
240 = 40x -25x = 15x
x = 240/15 = 16. Ans.
Q.
14. If
8 men or 12 women can do a piece of work in 10 days, then the number of days
required by 4 men and 4 women to finish the work is
(a) 8 (b)
10 (c) 12 (d) 4
(e) None of these
Ans:
(c) 12
Explanation:
8 men = 12 women
1 woman = 8/12 men = 2/3 men
4 women = 2/3 × 4 men = 8/3 men
4 men + 4 women = 4 + 8/3 men = 20/3 men
1 work done = 8 × 10
8 × 10 = 20/3 × ?days
?days = 8 × 10 × 3/20 = 12 days. Ans.
Q.
15. If
8 men can dig a well in 18 days, then the number of days, 12 men will take to
dig the same well will be
(a) 12 days
(b) 10 days (c) 8 days (d) 16 days (e) None of these
Ans:
(a) 12 days
Explanation:
Work done = 8 × 18
Then, 8 × 18 = 12 × ? days
? days = 8 × 18/12 = 12 days. Ans.
Q.
16. 39
men can repair a road in 12 days working 5 hours a day. In how many days will
30 men working 6 hours peer day complete the work?
(a) 10 (b)
13 (c) 14 (d) 15
(e) None of these
Ans:
(b) 13
Explanation:
1 work done = 39 × 12 × 5
39 × 12 × 5 = 30 × 6 × ?days
? days = 39 × 12 × 5/ 30 × 6 = 13 days. Ans.
Q.
17. A
certain number of men can do a work in 40days. If there were 8 men more, it
could be finished in 10 days less. How many men were there initially?
(a) 30 (b)
24 (c) 16 (d) 20
(e) None of these
Ans:
(b) 24
Explanation:
Let ‘x’ be the initial number of men
Then, 1 work done = x × 40
Then, x × 40 = (x + 8 ) (40 – 10)
40x =
30x + 240
10x = 240
Therefore, x = 240/10 = 24 men. Ans.
Q.
18. If
4 men or 6 boys can finish a work in 20 days. How long will 6 men and 11 boys
take to finish the same work?
(a) 10 days
(b) 6 days (c) 4 days (d) 3 days (e) None of these
Ans: (b) 6 days
Explanation:
4 men = 6 boys
Then, 1 boy =
4/6 men = 2/3 men
11 boys = 2/3 × 11 men = 22/3 men
Then, 6 men + 11 boys = 6 + 22/3 men = 40/3 men
1 work done = 4 men × 20days
That is, 4 × 20 = 40/3 × ? days
? days = 4 × 20 × 3/40 = 6 days. Ans.
Q.
19. A works twice as fast as B. if B can
complete a work in 12 days independently. The number of days in which A and B
can together finish the work?
(a) 18 days
(b) 8 days (c) 6 days (d) 4 days (e) None of these
Ans:
(d) 4 days
Explanation:
If B takes 12 days to finish the work, then A takes 6
days to finish the same work.
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
Therefore, the Number of days taken by A and B
together to finish the same work = 6 × 12/18
= 4 days. Ans.
Q.
20. A
and B can do a piece of work in 4 days. If A can do it alone in 12 days, B will
finish the work in
(a) 4 days
(b) 6 days (c) 8 days (d) 10 days
(e) None of these
Ans: (b) 6 days
Explanation:
If
A and B together can do a piece of work in x days and A alone can do the same
work in y days, then B alone can do the same work in x y/ y – x days.
Therefore, the number of days B will take to finish
the work = 4 × 12/ 12 – 4
= 48/8 = 6 days. Ans.
Q.
21. 5
men can do a piece of work in 6 days
while 10 women can do it in 5 days. In how many days can 5 women and 3 men do
it?
(a) 4 (b) 5
(c) 6 (d) 8
(e) None of these
Ans: (b) 5
Explanation:
5men × 6 = 10 women × 5
30 men = 50
women
1 woman = 30/50 men = 3/5 men
5 women = 3/5 × 5 men = 3 men
5 women + 3 men = 3 + 3 = 6 men
That is, 1 work done = 5 × 6
5 × 6 = 6 × ?days
? days = 5 × 6/6 = 5 days. Ans.
Q.
22. A work could be completed in 100 days.
However, due to the absence of 10 workers, it was completed in 110 days then,
the original number of workers was
(a) 100 (b)
110 (c) 55 (d) 50
(e) None of these
Ans:
(b) 110
Explanation:
Let ‘x’ be the original number of workers
Then, x × 100 = ( x – 10) 110
100 x = 110x – 1100
1100 = 10 x
x = 110. Ans.
Q.
23. A
particular job can be completed by a team of 10 men in 12 days. The same job
can be completed by a team of 10 women
in 6 days. How many days are needed to completed the job if the two teams work
together?
(a) 4 (b)
6 (c) 9 (d)
18 (e) None of these
Ans:
(a) 4
Explanation:
Consider men’s work days as one group and women’s
working days as other group
Then, the required No. of days = 12 × 6/18 = 4 days.
Ans.
Q.
24. A
can do a piece of work in 12 days, while B can do it in 8 days with the help of
C, they finish the work in 4 days. Then C alone can do the work in
(a) 24 days
(b) 20 days (c) 16 days (d) 4 days (e) None of these
Ans:
(a) 24 days
Explanation:
A and B together can do the work in 12 × 8/20 = 96/20 days
A +B and C together do the work in 4 days.
Then C alone can do the work in 96/20 × 4/96/20 – 4 days
= 96/5/16/20
= 96/5 × 20/16 = 24 days. Ans.
Q.
25. A
job can be completed by 12 men in 12 days. How many extra days will be needed
to complete the job if 6 men leave after working for 6 days?
(a) 3 (b)
12 (c) 6 (d) 24
(e) None of these
Ans: (c) 6
Explanation:
Half the work is done by 12 men in 6 days.
Remaining half should be done by 6 men in ? days
Then, 12 × 6
× ½ = 6 × ?days × ½
36 =
3 × ?days
? days = 36/3 =12 days
Extra days required = 12 -6 = 6 days. Ans.
Q.
26. Worker
A takes 8 hours to do a job. Worker B takes 10 hours to do the same job. How
long should it take, worker A and worker B, working together but independently,
do the same job?
(a) 4 1/9 hours
(b) 4 2/9 hours (c) 4 4/9
hours (d) 4 5/9 hours (e) None of these
Ans:
(c) 4 4/9 hours
Explanation:
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
Then 8 × 10/18 = 4 4/9 hours. Ans.
Q.
27. Three
workers working all days can do a work in 10 days. But one of them having other
employment can work only half time. In how many days the work can be finished?
(a) 15
days (b) 16 days (c) 12 days (d) 12.5 days (e) None of these
Ans:
(c) 12 days.
Explanation:
Sum of each persons’ one day’s work = 1/3 ×10 + 1/3
×10 + 1/3× 20 = 1/30 + 1/30 + 1/60
= 5/60 = 1/12
Therefore, the work can be finished in 12 days. Ans.
Q.
28. Sam,
Bob and Kim can do a job alone in 15 days, 10 days and 30 days respectively.
Sam is helped by Bob and Kim every third day. In how many days will the job be
completed?
(a) 9 days
(b) 8 1/3 days (c) 8 days (d) 6 1/3 days (e) None of these
Ans:
(a) 9 days
Explanation:
The work done by the three persons in 3 days (
because Sam works only on every third day)
= 3/15 + 1/10 + 1/30 = 6 + 3 +
1/30 = 10/30
= 1/3 of the work
Therefore, the job will be completed in 3 × 3 = 9
days. Ans.
Q.
29. Prakash
alone can complete a job in 12 hours, Jayant alone can complete the same job in
6 hours. How many hours will they take together to complete the job?
(a) 4 (b)
6 (c) 2 (d) 8
(e) None of these
Ans:
(a) 4
Explanation:
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
Here, the No. of hours required to complete the work
, working together = 12 × 6/18
= 4 hours. Ans.
Q.
30. 56
men completes a work in 12 days. How many men will be required to complete the
work in 16 days?
(a) 38 (b)
24 (c) 42 (d) 48
(e) None of these
Ans:
(c) 42
Explanation:
1 work done = 56 men × 12 days
Then, 56 ×12 = ? men × 16
? men = 56 × 12/16 = 42 men. Ans.
Q.
31. Six
men or tern boys can do a piece of work in fifteen days. How long would it take
for 12 men and 5 boys to do the same piece of work?
(a) 6 days
(b) 28 days (c) 25 days (d) 7 days (e) None of these
Ans:
(a) 6 days
Explanation:
6 men = 10 boys
Then, 1 boy = 6/10 men = 3/5 men
Then, 5 boys = 3/5 × 5 = 3 men
12 men + 5 boys = 15 men
1 work done = 6 men × 15 days
Therefore, 6
× 15 = 15 × ? days
? days = 6 × 15/15 = 6 days. Ans.
Q.
32. If
4 workers can make 42 toys in 6 days,
how many toys can 12 workers make in 3 days?
(a) 63 (b)
28 (c) 252 (d) 7
(e) None of these
Ans:
(a) 63
Explanation:
4 workers in 3 days make 21 toys,
Then, 1 worker can make 21/4 toys in 3 days
Therefore, No. of toys made by 12 workers in 3 days
= 21/4 × 12 = 63 toys. Ans.
Q.
33. 10
men can complete a piece of work in 15 days and 15 women can complete the same
work in 12 days. If all the 10 men and 15 women work together, in how many days
will work get completed?
(a) 6 (b) 7
2/3 (c) 6 2/3 (d) 6 1/3 (e) None of these
Ans:
(c) 6 2/3
Explanation:
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
Here, men’s working days can be taken as A and that of women as B
Then, 15 × 12/27 = 6 2/3 days.Ans.
Q.
34. Three men, four
women and six children can complete a work in 7 days . A woman does double the
work a man does and a child does half the work a man does. How many women can
complete this work in 7 days?
(a) 8 (b)
7 (c) 12 (d) 10
(e) None of these
Ans:
( b) 7
Explanation:
3 men = 3/2 women
1 child = 1/2/2 = ¼ woman
Then, 6 children = ¼ × 6 = 6/4 = 3/2 women
Then, 3/2 women + 4 women + 3/2 women = 7 women
7
women does the work in 7 days.
Therefore, the No. of women required to finish the
work in 7days = 7. Ans
Q.
35. A sum of money
is sufficient to pay P’s wages for 25 days or Q’s wages for 30 days. The money
is sufficient to pay the wages of both for
(a) 13 5/11 days
(b) 13 days (c) 13 6/11
days (d) 13 7/11 days
(e) None of these
Ans:
(d) 13 7/11
Explanation:
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
Here, wages can be taken as days,
Then, 25 ×30/ 55 = 13 7/11 days. Ans.
Q.
36. A
certain number of men complete a piece of work in 50 days. If there were 8 men
more the work could be finished in 10 days less. How many men were originally
there?
(a) 40 (b)
50 (c) 32 (d) 25
(e) None of these
Ans:
(c) 32
Explanation:
Let the original No. of men = x
Then, I work
done = 50x
Then, 50x = (x + 8) 40
50x = 40x + 320
10 x = 320
x = 320/10 = 32 men. Ans.
Q.
37. A and B together finish a work in 30
days they worked for it for 20 days and then B left. The remaining work was
done by A alone in 20 more days. B alone can finish the work in
(a) 48 days
(b) 50 days (c) 54 days (d) 60
days (e) none of these
Ans:
( d) 60 days
Explanation:
(A + B)’s 1 days work = 1/30
A+B ‘s 20 days work = 1/30 × 20 = 2/3
Remaining work = 1 -2/3 = 1/3
1/3 of the work is done by A in 20 days
Therefore, A can complete the full work in 3 × 20 =
60 days
So, A’s 1 day’s work = 1/60
Then, B’s 1 day work = 1/30 – 1/60 = 1/60
Therefore, B can complete the work in 60 days. Ans.
Q.
38. A
can complete a job in 9 days, B in 10 days and C in 15 days. B and C start the
work together and are forced to leave after 2 days. The time taken to complete the remaining work is
(a) 13 days
(b) 10 days (c) 9 days (d) 6 days (e) None of these
Ans:
(d) 6 days
Explanation:
A’s 1 day work = 1/9
B’s 1 day work = 1/10
C’s 1 day work = 1/15
B + C ‘ s 1 day work = 1/10 + 1/15 = 1/6
B + C’s 2 day’s work = 1/6 × 2 = 1/3
The work remaining = 1 – 1/3 = 2/3
A can do the full work in 9 days.
So, the remaining 2/3 of the work is done by A in
2/3 × 9 days = 6 days. Ans.
Q.
39. If
40 men working 9 hours a day can finish a work in 21 days, in how many days
will 27 men working 10 hours a day do the same work?
(a) 20 days
(b) 28 days (c) 29 days (d) 25 days (e) None of these
Ans:
(b) 28 days
Explanation:
That is, 1 work done = 40 × 9 × 21
Then, 40 × 9 × 21 = 27 × 10 × ? days
Therefore, ? days = 40× 9 × 21 /27 × 10 = 28 days. Ans.
Q.
40. 8
children and 12 men complete a certain piece of work in 9 days. Each child
takes twice the time taken by a man to finish the work. In how many days will
12 men finish the same work?
(a) 8 (b)
15 (c) 9 (d) 12
(e) None o f these
Ans:
(d) 12
Explanation:
8 children = 4men
Then, 4 + 12 = 16 men completes the job in 9 days
Then, 16 × 9 = 12 × ? days
? days = 16 × 9/12 = 12 days. Ans.
Q.
41. Rajesh
and Ajay can complete a job in 16 days. Rajesh alone can do it in 24 days. How
long will Ajay alone take to finish the whole work?
(a) 20 days
(b) 48 days (c) 30 days (d) 36 days (e) 28 days
Ans:
(b) 48 days
Explanation:
If
A and B together can do a piece of work in x days and A alone can do the same
work in y days, then B alone can do the same work in x y/ y – x days.
Then, Ajay alone can finish the whole work in, 16 ×
24/24 – 16 = 16 × 24/8 = 48 days.Ans.
Q.
42. Ram,
Shyam and Mohan can do a piece of work in 12, 15 and 20 days respectively. How
long will they take to finish it together?
(a) 10 days
(b) 12 days (c) 14 days (d) 8 days
(e) 5 days
Ans:
(e) 5 days
Explanation:
When
A, B and C can do a work in x, y and z days respectively. Then, the three of
them together can finish the work in
xyz/ x y + y z + x z days
Therefore, the No. of days taken by them together to finish the whole work
= 12 × 15 × 20/12 × 15 + 15 × 20 + 12 × 20
= 12 × 15 × 20/720 = 5 days. Ans.
Q.
43. Tapas
works twice as much as Mihir. If both of them finish the work in 12 days, Tapas
alone can do it in:
(a) 20 days
(b) 24 days (c) 18 days (d) 20 days (e) None of these
Ans:
(c)18 days
Explanation:
Mihir = 2 Tapas
(Consider, Tapas as ‘T’ and Mihir
as “M”)
So, T ×2 T/ T + 2T = 12
2 T × T/3 T = 12
2 T = 3 × 12 = 36
T = 36/2 = 18 days i.e. No. of days taken by Tapas
alone = 18 days. Ans.
Q.
44. Xavier
can do a job in 40 days. He worked on it for 5 days and then Paes finished it
in 21 days. In how many days Xavier and Paes can finish the work?
(a) 10 (b)
15 (c) 20 (d) 840/61 (e) 12
Ans:
(b) 15
Explanation:
Xavier’s one day’s work = 1/40
His 5 days work = 1/40 × 5 = 1/8
The work remaining = 1 – 1/8 = 7/8
7/8 of the work is done by Paes in 21 days
Then, his 1 day’s work = 7/8/21 = 7/21 × 8 = 1/24
Therefore, the time taken by Paes to finish the
whole work = 24 days.
Then. The No. of days two of them together take to
finish the work = 40 × 24/40 + 24
= 40 × 24/64 = 15 days. Ans.
Q.
45. A
can finish a work in 18 days and B can do the same work in half the time taken
by A. Then, working together, what part of the same work they can finish in a
day?
(a) 1/6 (b)
1/9 (c) 2/5 (d) 2/7
(e) None of these
Ans:
(a) 1/6
Explanation:
B alone can do the same work in 9 days
So, the No. of days both of them together take to do
the work = 18 × 9/ 18 + 9
=18 × 9/27
= 6 days.
The part of the work, they together finish in one
day = 1/6. Ans.
Q.
46. A,
B and C can complete a piece of work in 24, 6 and 12 days respectively. Working
together, they will complete the same work in:
(a) 1/24 day
(b) 7/24 day (c) 3 3/7
days (d) 4 days (e) None of these
Ans: (c) 3 3/7 days
Explanation:
When
A, B and C can do a work in x, y and z days respectively. Then, the three of
them together can finish the work in
xyz/ x y + y z + x z days
Therefore, the No. of days taken by them together =
24 × 6 × 12/24 × 6 + 6 × 12 + 24 × 12
= 24 × 6 × 12/ 504 = 3 3/7 days. Ans.
Q.
47. A
man can do a piece of work in 5 days, but with the help of his son, he can do
it in 3 days. In what time can the son do it alone?
(a) 6 ½ days
(b) 7 days (c) 7 ½ days (d) 8 days
(e) None of these
Ans: (c) 7 ½ days
Explanation:
If
A and B together can do a piece of work in x days and A alone can do the same
work in y days, then B alone can do the same work in x y/ y – x days.
Therefore, his son alone can do the work in 3 × 5/ 5
– 3 = 15/2 = 7 ½ days. Ans.
Q.
48. A
works twice as fast as B. if B can complete a work in 12 days independently,
the number of days in which A and B can together finish the work is:
(a) 4 days
(b) 6 days (c) 8 days (d) 18 days (e) None of these
Ans:
(a) 4 days
Explanation:
That is, if b alone can finish the work in 12 days,
A alone can finish the work in 6 days.
If A can complete a work in x days and B can
complete the same work in y days, then, both of them together can complete the
work in x y/ x+ y days.
Therefore,
A and B can together finish the work in 6 × 12/18 days = 4 days. Ans.
Q.
49. A
is twice as good a workman as B and together they finish a piece of work in 14
days. The number of days taken by A alone to finish the work is:
(a) 11 (b)
21 (c) 28 (d) 42
(e) None of these
Ans:
(b) 21
Explanation:
A’s work is twice as B’s work
So, we can consider 2A = B
Then, A × 2A/ A+ 2A = 14
2A × A/ 3A = 14
2 A = 14 × 3
A = 21 days. i.e. A alone can finish the work in 21
days. Ans.
Q.
50.
A is thrice as good a workman as B and
therefore is able to finish a job in 60 days less than B. Working together,
they can do it in:
(a) 20 days
(b) 22 ½ days (c) 25 days (d) 30 days (e) None of these
Ans:
(b) 22 ½ days
Explanation:
That is, 3A = B, replacing 3 A in place of B, we get
3A – A = 60 days
A = 30 days, i.e. A alone can finish the work in 30
days
Then, B alone can finish the work in 3 ×30 = 90 days
Therefore, working together they can finish it in 30
× 90/ 120 days. = 22 ½ days. Ans.
Q.
51. A
and B can do a job together in 7 days. A is 1 ¾ times as efficient as B. the
same job can be done by A alone in:
(a) 9 1/3
days (b) 11 days (c) 12 ¼ days (d) 16 1/3 days (e) None
of these
Ans:
(b) 11 days
Explanation:
1 ¾ = 7/4
7/4 A = B, replacing B by 7/4 A, we get
A × 7/4 A/ A + 7/4 A = 7days
7 A × A/4 / 11A/4 = 7 A × A/ 11 A = 7A /11 = 7
A = 77/7 = 11,
So, A alone can finish the work in 11 days. Ans.
Q.
52. Sakshi
can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The
number of days taken by Tanya to do the same piece of work is:
(a) 15 (b)
16 (c) 18 (d) 25
(e) None of these
Ans:
(b) 16
Explanation:
The ratio of their efficiency, i.e. Sakshi : Tannya
= 100 : 125 = 4 : 5
Therefore, ratio of time taken by them = 5 : 4
That is, No. of days taken by Sakshi is 5 units of
ratio = 20 days
So, 1 unit of ratio = 20/5 = 4 days
Therefore, No. of days taken by Tannya = 4 × 4 = 16 days. Ans.
Q.
53. A
is 30% more efficient than B. How much time will they, working together, take
to complete a job which A alone could have done in 23 days?
(a) 11 days
(b) 13 days (c) 20 3/17
days (d) 14 days (e) None of these
Ans:
(b) 13 days
Explanation:
The ratio of their efficiency = A : B = 130 : 100 = 13 : 10
Therefore, the ratio of the time taken by them = 10
: 13
A takes 23 days = 10 units of ratio
So, 1 unit of
ratio = 23/10
Time taken by B alone to finish the work =
23/10 ×13 = 29.9 = 30 days
Therefore, the No. of days taken to finish the work
working together = 23 × 30/ 53
= 13 days. Ans.
Q.
54. A
does half as much work as B in three-fourth of the time. If together they take
18 days to complete the work, how much time shall B take to do it ?
(a) 30 days
(b) 35 days (c) 40 days (d) 36 days (e) None of these
Ans:
(a) 30 days
Explanation:
That is , A = 3B/2/1/2 = 3B/2
Replacing A by 3B/2, we get
3B/2× B/3B/2 + B = 18 days
3 B ×B/5B =18
3B = 90
B = 30 days,
B alone can finish the work in 30 days. Ans.
Q.
55. A
can do a work in 15 days and B in 20 days. If they work on it together for 4
days, then the fraction of the work that is left is:
(a) ¼ (b)
1/10 (c) 7/15 (d) 8/15
(e) None of these
Ans:
(d) 8/15
Explanation:
Working together, the No. of days taken by them to
finish the work = 15 × 20/35
= 60/7 days.
Then, their 1 day’s work = 7/60
Their, 4 days work = 7 × 4/60 = 7/15 of the total
work
Therefore, the fraction of the work, that is left =
1- 7/15 = 8/15. Ans.
Q.
56. A
can finish a work in 18 days and B can do the work in 15 days. B worked for 10
days and left the job. In how many days, A alone can finish the remaining work
(a) 5 (b) 5
½ (c) 6 (d) 8
(e) None of these
Ans:
(c) 6 days
Explanation:
B’s one day’s work = 1/15
B’s 10 day’s work = 1/15 × 10 = 2/3
Remaining work = 1/3
A’s 1 day work = 1/18
No. of days A take to finish 1/3 of the work = 1/3/1/18
= 1/3 × 18 = 6 days. Ans.
Q.
57. A
and B can complete a work in 15 days and 10 days respectively. They started
doing the work together but after 2 days B had to leave and A alone completed
the remaining work. The whole work was completed in:
(a) 8 days
(b) 10 days (c) 12 days (d) 15 days
(e) None of these
Ans: (c) 12 days
Explanation:
No. of days taken by them working together = 15 ×
10/25 = 6 days
Their 1 day’s work
= 1/6
Their 2 day’s work = 1/6 × 2 = 1/3
The work remaining = 2/3
A’s 1 day work = 1/15
Time taken by A to finish 1/3 of the work = 2/3/1/15 = 2/3 ×15 = 10 days
Therefore, the total number of days taken to finish
the whole work = 10 +2 = 12 days. Ans.
Q.
58. A can
finish a work in 24 days, B in 9 days
and C in 12 days. B and C start the work but are forced to leave after 3 days.
The remaining work was done by A in:
(a) 5 days
(b) 6 days (c) 10 days (d) 10 ½ days (e) None of these
Ans:
(c) 10 days
Explanation:
No. of days taken by B and C together to finish the
work = 9 × 12/21 = 36/7 days
Their 1 day work = 7/36
So, their 3 day’s work = 7/36 × 3 = 7/12
The remaining work = 5/12
A’s 1 day’s work = 1/24
To finish the remaining 5/12 of the work, the No. of
days taken by A = 5/12/1/24
= 5/12 ×24= 10 days. Ans.
Q.
59. A
machine P can print one lakh books in 8 hours, machine Q can print the same
number of books in 10 hours while machine R can print them in 12 hours. All the
machines are started at 9 a.m. while
machine P is closed at 11 a.m. and the remaining two machines complete the
work. Approximately at what time will the work be finished?
(a) 11: 30 a.m.
(b) 12 noon (c) 12:30 p.m. (d) 1 p.m.
(e) None of these
Ans:
(d) 1 p.m.
Explanation:
The three machines 1 hour’s work = 1/8 + 1/10 + 1/12
= 37/120
Their, work from 9 a.m. to 11 a.m. = 2 hour’s work =
37/120 × 2= 27/60
The remaining work = 23/60
Machines Q and R’s 1 hours work = 1/10 + 1/12 =
11/60
Therefore, the time taken by Q and R to finish the
remaining 23/60 work = 23/60/11/60
= 23/60 × 60/11 = 23/11 = 2 hours
approx.
Therefore, the approximate time at which the work is finished = 11 + 2 = 1 p.m. Ans.
Q.
60. A
and B can do a piece of work in 30 days, while B and C can do the same work in
24 days and C and A in 20 days. They all work together for 10 days when B and C
leave. How many days more will A take to finish work?
(a) 18 days
(b) 24 days (c) 30 days (d) 36 days (e) None of these
Ans:
(a) 18 days
Explanation:
i.e. 2 ( A + B + C) ‘s 1 day’s work = 1/30 + 1/24 +
1/20 = 1/8
their 1 day’s work = 1/8/2 = 1/16
their 10 days work = 1/16 × 10 = 5/8
the remaining work = 3/8
A’s 1 day’s work = 1/16 – 1/24 = 1/48
Therefore, the No. of days A alone will take to
complete 3/8 of the work = 3/8/ 1/48
= 3/8 × 48 =
3 × 6 = 18 days. Ans.
Q.
61. X
and Y can do a piece of work in 20
days and 12 days respectively. X started the work alone and then after 4 days Y
joined him till the completion of the work. How long did the work last?
(a) 6 days
(b) 10 days (c) 15 days (d) 20 days (e) None of these
Ans:
(b) 10 days
Explanation:
X’s 1 day’s work = 1/20
X’s 4 day’s work = 1/20 × 4 = 1/5
The remaining work = 4/5
X and Y’s 1 day work = 1/20 + 1/12 = 4/30 = 2/15
Therefore, Both together finish the remaining work
in 4/5/2/15 days
=
4/5 × 15/2 = 6 days
Therefore, the total number of days taken to finish
the work = 4 + 6 = 10 days. Ans.
Q.
62.
A and B can together finish a work in 30 days. They worked together for 20 days
and then B left. After another 20 days, A finished he remaining work. In how
many days A alone can finish the job?
(a) 40 (b)
50 (c) 54 (d) 60
(e) None of these
Ans:
(d) 60
Explanation:
A + B ‘s 1 day’s work = 1/30
Their 20 day’s work = 1/30 × 20 = 2/3
Remaining work = 1/3
1/3 of the work is done by A in 20 days.
Then, whole work can be done by A in 3 × 20 = 60
days. Ans.
Q.
63. X
can do a piece of work in 40 days. He works at it for 8 days and then Y
finished it in 16 days. How long will they together take to complete the work?
(a) 13 1/3 days
(b) 15 days (c) 20 days (d) 56 days (e) None of these
Ans:
(a) 13 1/3 days
Explanation:
A’s 8 day’s work = 1/40 × 8 = 1/5
Remaining work = 4/5
4/5 of the work is finished by Y in 16 days’
So, Y can finish the whole work alone in 16 ×5/4
days = 20days
They both together can finish it in 40 × 20/60 =13
1/3 days. Ans.
Q.
64. A does 4/5 of a
work in 20 days. He then calls in B and they together finish the remaining work
in 3 days. How long B alone would take to do the whole work?
(a) 23 days
(b) 37 days (c) 37 ½ days (d) 40 days (e) None of these
Ans: (c) 37 ½ days
Explanation:
A alone can finish the work in 20 × 5/4 days = 25 days
A’s 1 day’s work = 1/25
A and B together can finish the whole work in 5 × 3
days = 15 days
Their 1 day’s work = 1/15
Therefore, B’s 1 day’s work = 1/15 – 1/25 = 1/37 ½
Therefore, B alone can finish the whole work in 37 ½
days.Ans.
Q.
65. A
and B together can do a piece of work in 30 days. A having worked for 16 days,
B finishes the remaining work alone in 44 days. In how many days shall B finish
the whole work alone?
(a) 30 days
(b) 40 days (c) 60 days (d) 70 days (e) None of these
Ans:
(c) 60 days
Explanation:
A + B’s 1 day’s work = 1/30
i.e. A + B = 1/30
--------- (i)
16 A + 44 B = 1 ------ (ii)
( i.e. 1 = the whole work done)
Multiplying (i) by 16
and subtracting it from (ii), we get
i.e. 16 A + 44 B = 1
16 A + 16B = 8/15
28 B =7/15
B = 1/60 i.e. B’s 1
day’s work = 1/60
Therefore, B alone can finish the work in 60 days. Ans.
Q.
66. A and B together can do a piece of work
in 12 days, which B and C together can do in 16 days. After A has been working
at it for 5 days and B for 7 days, C finishes it in 13 days. In how many days C
alone will do the work?
(a) 16 (b) 24
(c) 36 (d) 48 (e) None of these
Ans:
(b) 24
Explanation:
According to the
question,
A + B’s 1 day’s work =
1/12
B+ C’s 1 days’ work =
1/16
A worked for 5 days, B
for 7 days and C for 13 days. So, we can assume that,
A+ B has been working
for 5 days and B+ C has been working for 2 days and C alone for 11 days.
i.e. A’s 5 day’s work +
B’s 7 day’s work + C’s 13 day’s work = 1
(A+ B)’s 5 days work +
(B + C)’s 2 days work + C’s 11 day’s work = 1
5/12 + 2/16 + C’s 11
days work = 1
So, C’s 11 day’s work =
1 – (5/12 + 2/16) = 11/24
C’s 1 days’ work =
11/24/11 = 1/24
Therefore, C alone can
finish the work in 24 days. Ans.
Q.
67. A
and B can do a piece of work in 45 days and 40 days respectively. They began to
do the work together but A leaves after some days and then B completed the
remaining work in 23 days. The number of days after which A left the work was:
(a) 6 (b) 8
(c) 9 (d) 12 (e) None of these
Ans:
(c) 9
Explanation:
A and B together can
finish the work in 45 × 40/85 = 360/17 days
A and B’s 1 day’s work
= 17/360
A’s 1 day’s work = 1/45
B’s 1 day’s work = 1/40
B’s 23 day’s work 1/40
× 23 = 23/40
Remaining work = 1 –
23/40 = 17/40
17/40 of the work is
done by A and B together
17/40 of the work is done by A and B together in =
17/40/17/360 = 17/40 × 360/17 days
= 9 days.
Therefore, A left after 9 days. Ans.
Q.
68. A
can do a piece of work in 20 days which B can do in 12 days. B worked at it for
9 days. A can finish the remaining work in:
(a) 3 days
(b) 5 days (c) 7 days (d) 11 days
(e) None of these
Ans:
(b) 5 days
Explanation:
A’ s 1 day’s work = 1/20
B’s 1 day’s work = 1/12
B’s 9 days work = 1/12 × 9 = ¾
Remaining work = ¼
A can finish the remaining work in = 1/4/1/20 = ¼
×20 = 5 days. Ans.
Q.
69. A
and B together can complete a work in 3 days. They start together. But, after 2
days, B left the work. If the work is completed after 2 more days, B alone
could do the work in
(a) 5 days
(b) 6 days (c) 9 days (d) 10 days (e) None of these
Ans:
(b) 6 days
Explanation:
A and B’s 1 day’s work = 1/3
Their 2 day’s work = 1/3 × 2 = 2/3
Remaining work = 1/3
1/3 of the work is finished by A in 2 days
Then, the whole work can be finished by A alone in 3
× 2 = 6 days
So, A’s 1 day’s work = 1/6
Therefore, B’s 1 day’s work = 1/3 – 1/6 = 1/6
Therefore, the whole work can be done B alone in 6
days. Ans.
Q.
70. A
man, a woman and a boy together complete a piece of work in 3 days. If a man
alone can do it in 6 days and a boy alone in 18 days, how long will a woman
take to complete the work?
(a) 9 days
(b) 21 days (c) 24 days (d) 27 days (e) None of these
Ans:
(a) 9 days
Explanation:
(Man + Boy + Woman)’s 1 day’s work = 1/3
Man’s 1day’s work = 1/6
Boy’s 1 day’s work = 1/18
Then, Woman’ 1 day’s work = 1/3 – ( 1/6 + 1/18) =
1/3 – 4/18 =2/18 = 1/9
Therefore, the Woman alone can finish the work in 9
days. Ans.
Q.
71. A
can do 1/3 of a work in 5 days and B can do 2/5 of the work in 10 days. In how
many days both A and B together can do the work?
(a) 7 ¾ (b)
8 4/5 (c) 9 3/8 (d) 10
(e) None of these
Ans:
(c) 9 3/8
Explanation:
A can do finish the whole work in 3 × 5 days = 15
days
B can finish the whole work in 5 /2 × 10 days = 25
days
A and B together can finish the work in 15 × 25/ 40
days = 9 3/8 days. Ans.
Q.
72. A
and B can do a piece of work in 12 days; B and C can do it in 15 days and C and
A can do it in 20 days. A alone can do the work in:
(a) 15 2/3 days
(b) 24 days (c) 30 days (d) 40 days (e) None of these
Ans:
(c) 30 days
Explanation:
2 (A + B + c)’s 1 day’s work = 1/12 + 1/15 + 1/20 =
12/60 = 1/5
A + B + C’s 1 day’s work = 1/5/2 = 1/10
A’s 1 day’s work = 1/10 – (B + C)’s 1 day’s work =
1/10 – 1/15 = 1/30
Therefore, A alone can finish the work in 30 days. Ans.
Q.
73. A
and B together can complete a piece of work in 8 days while B and C together
can do it in 12 days. All the three together can complete the work in 6 days.
In how much time will A and C together complete the work?
(a) 8 days
(b) 10 days (c) 12 days (d) 20 days (e) None of these
Ans:
(a) 8 days
Explanation:
A’s 1 day’s work = A + B + C’s 1 day’s work – B +
C’s 1 day’s work = 1/6 – 1/12
= 1/12
B’s 1 day’s work = A + B’s 1 day’s work – A’s 1
day’s work = 1/8 – 1/12= 1/24
C’s 1 day’s work = B+ C’s 1 day’s work – B’s 1 day’s
work = 1/12 – 1/24 = 1/24
A +B’ 1 day’s work = 1/12 + 1/24 = 3/24
Therefore, A and C together will finish the whole
work in 24/3 = 8 days. Ans.
Q.
74. A
can do a work in 4 days, B can do it in 5 days and C can do it in 10 days. A, B
and C together can do the work in
(a) 1 3/5
days (b) 1 9/11 days (c) 2 5/6 days (d) 3 days (e) None of these
Ans:
(b) 1 9/11 days
Explanation:
When
A, B and C can do a work in x, y and z days respectively. Then, the three of
them together can finish the work in
xyz/ x y + y z + x z days
That is, A, B and C together ca do the work in 4 × 5
× 10/ 20 + 50 + 40
= 4 × 5 × 10/110 = 20/11 = 1 9/11 days. Ans.
Q.
75. 3
men or 5 women can do a work in 12 days. How long will 6 men and 5 women take
to finish the work?
(a) 4 days
(b) 10 days (c) 15 days (d) 20 days
(e) None of these
Ans:
(a) 4 days
Explanation:
3 men = 5 women
1 woman = 3/5 men
So, 5 women = 3/5 × 5 = 3 men
6 men and 5 women = 6 + 3 = 9 men
1 work done = 3 men × 12 days
3 × 12 = 9 × ? days
? days = 3 × 12/9 = 4 days. Ans.
Q.
76. Kamal
can do a work in 15 days. Bimal is 50% more efficient than Kamal. The number of
days, Bimal will take to do the same piece of work, is
(a) 10 (b)
10 ½ (c) 12 (d) 14
(e) None of these
Ans:
(a) 10
Explanation:
Kamal’s 15 days is 150% of No. days taken by Bimal
to finish the job.
Therefore, the No. of days taken by Bimal = 15/150 ×
100 = 10 days. Ans.
Q.
77. A
does 20% less work than B. if A can complete a piece of work in 7 ½ hours, then
B can do it in
(a) 5 hours
(b) 5 ½ hours (c) 6 hours (d) 6 ½ hours (e) None of these
Ans:
(c) 6 hours
Explanation:
B can finish the work in 80% of 7 ½ hours of time
7 ½ = 15/2
Therefore, time taken by B = .8 × 15/2 = 30/5 = 6
hours. Ans.
Q.
78. Ram
and Shyam together can finish a job in 8
days. Ram can do the same job on his own in 12 days. How long will Shyam take
to do the job by himself?
(a) 16 days
(b) 20 days (c) 24 days (d) 30 days (e) None of these
Ans: (c) 24 days
Explanation:
If
A and B together can do a piece of work in x days and A alone can do the same
work in y days, then B alone can do the same work in x y/ y – x days.
Therefore,
the No. of days Shyam take to finish the job alone = 8 × 12/12 – 8
=
8 × 12/4 = 24 days. Ans.
Q.
79. The
rates of working of A and B are in the ratio 3 : 4. The number of days taken by
them to finish the work are in the ratio:
(a) 3 : 4
(b) 9 : 16 (c) 4 : 3 (d) 3 : 2
(e ) None of these
Ans:
(c) 4 : 3
Explanation:
The No. of days taken by them = inverse ratio = 4 :
3. Ans.
Q.
80. A
certain number of men complete a piece of work in 60 days. If there were 8 men
more, the work could be finished in 10 days less. How many men were originally
there?
(a) 30 (b)
40 (c) 32 (d) 36
(e) None of these
Ans: (b) 40
Explanation:
Let ‘x’ be the original number of men
Then 1 work done = x × 60
Then, 60x = (x + 8) 50
60x = 50x +
400
10 x = 400
x = 40. Ans.
Q.
81. A
does half as much work as B in three- fourth of the time. If together they take
18 days to complete the work, how much time shall B take to do it?
(a) 30 days
(b) 35 days (c) 40 days (d) 42 days (e) None of these
Ans:
(a) 30 days
Explanation:
Let ‘x’ be the number of days taken by B alone to
finish the whole work
Then, A alone will finish the whole work in 3x/4 × 2
days = 3x/2 days.
Then, working together,
3x/2 × x/3x/2 + x = 18 days
3x × x/5x = 18
3x/5 = 18
Therefore, the number of days taken by B = x = 18 × 5/3 = 30 days. Ans.
Q.
82. A
and B can finish a piece of work in 12 days and 18 days respectively. A begins
to do the work and they work alternately one at a time for one day each. The
whole work will be completed in
(a) 14 1/3 days
(b) 15 2/3 days (c) 16 1/3
days (d) 18 2/3 days (e) None of these
Ans:
(a) 14 1/3 days
Explanation:
Both of them together can finish the work (daily
working) in 12 × 18/30 days = 36/5
= 7 1/5 days.
By working in alternate days, their 2 day’s work = 5/36
Their, 14 day’s work (because they take more than
double of 7 days) = 5/36 × 7
= 35/36
Remaining work = 1 – 35/36 = 1/36
Because A started the work, the remaining work is
finished by A
A’s 1 day’s work = 1/12
Therefore, the No. of days taken by A to finish 1/36
work = 1/36/1/12 = 1/3 days.
Therefore, the total work is completed in 14 + 1/3 =
14 1/3 days. Ans.
Q.
83. A
can do a piece of work in 14 days which B alone can do in 21 days. They begin
together but 3 days before the completion of the work, A leaves off. The total
number of days for the work to be completed is
(a) 6 3/5 days
(b) 8 ½ days (c) 10 1/5 days (d) 13 ½ days (e) None of these
Ans:
(c) 10 1/5 days
Explanation:
B’s 1 day’s work = 1/21
B’s 3 day’s work = 1/21 ×3 = 1/7
The remaining work finished by both of them = 1 –
1/7 = 6/7
Both together can finish it in 14 × 21/35 days = 42/5
days
Their, 1 day’s work = 5/42
Therefore, the No. of days taken by them together to
finish 6/7 work
= 6/7/5/42 = 6/7 × 42/5 = 36/5 =
7 1/5 days
Therefore, the total No. of days for the work to be
completed = 3 + 7 1/5 = 10 1/5 days. Ans.
Q.
84. A
and B can finish a piece of work in 30 days. They worked at it for 20 days and
then B left. The remaining work was done by A alone in 20 more days. A alone
can finish the work in
(a) 48 days
(b) 50 days (c) 54 days (d) 60 days (e) None of these
Ans:
(d) 60 days
Explanation:
(A + B)’s 1 day’s work = 1/30
Their 20day’s work = 1/30 × 20 = 2/3
Remaining 1/3 work is done by A in 20 days
Therefore, A alone can finish the work in 3 × 20 =
60 days. Ans.
Q.
85. 10
women can complete a work in 8 days and 10 children take 12 days to complete
the work. How many days will 6 women and 3 children together take to complete
the work?
(a) 7 (b)
8 (c) 9 (d) 12
(e) None of these
Ans:
(e) None of these
Explanation:
1 women’s 1 day’s work = 1/8/10 = 1/80
1 child’s 1 day’s work = 1/12/10 = 1/120
6 women’s 1 day’s work = 1/80 × 6 = 3/40
3 children’s 1 day’s work = 1/120 × 3 = 1/40
6 women’s + 3 children’s 1 day’s work = 3 /40 + 1/40
= 1/10
Therefore, they will finish the whole work in 10
days. Ans.
Q.
86. 9
children can complete a piece of work in 360 days; 18 men can complete the same
piece of work in 72 days and 12 women can complete it in 162 days. In how many
days can 4 men, 12 women and 10 children together complete the piece of work?
(a) 68 days (b)
81 days (c) 96 days (d) 124 days (e) None of these
Ans: (b) 81 days
Explanation:
1 child’s 1 day’s work = 1/360 ×9 = 1/3240
10 children’s 1 day’s work = 1/324
1 man’s 1 day’s work = 1/72 × 18 = 1/1296
4 men’s 1 day’s work = 1 ×4/1296 = 1/324
12 women’s 1 day’s work = 1/162 given
Then, (4 men + 12 women + 10 children)’s 1 day’s
work = 1/324 + 1/162 + 1/324
= 1/324 + 2/324 + 1/324 = 4/324 =
1/81
Therefore, the required No. of days = 81 days. Ans.
Q.
87. 9
men working 7 hours a day can complete a piece of work in 15 days. How many
days can 6 men working for 9 hours a day, complete the same piece of work?
(a) 15 ¾ days
(b) 16 days (c) 16 ¾ days (d) 17 ½ days (e) None of these
Ans:
(d) 17 ½ days
Explanation:
1 work done = 9 × 7 × 15
9 × 7 × 15 = 6 × 9 × ? days
? days = 9 × 7 × 15/6 × 9
=
35/2 = 17 ½ days. Ans.
Q.
88. A
man, a woman and a boy can together complete a piece of work in 3 days. If a
man alone can do it in 6 days and a boy alone in 18 days, how long will a woman
take to complete the work?
(a) 9 days
(b0 21 days (c) 24 days (d) 27 days
(e) None of these
Ans:
(a) 9 days
Explanation:
(1 Man + 1 woman + 1 boy)’s 1day’s work = 1/3
1 man’s 1 day work = 1/6
1boy’s 1
day’s work = 1/18
(1 Man + 1 boy) ‘s 1 day’s work = 1/6 + 1/18 = 2/9
Therefore, 1
woman’s 1 day’s work = 1/3 – 2/9 = 3-2/9 = 1/9
Therefore, the woman alone can finish the work in 9
days. Ans.
Q.
89. 8
men can do a piece of work in 12 days. 4 women can do it in 48 days and 10
children can do it in 24 days. In how many days can 10 men, 4 women and 10
children together complete the piece of work?
(a) 5
days (b) 15 days (c) 28 days (d) 6 days (e) None of these
Ans:
(d) 6 days
Explanation:
1 man’s 1 day’s work = 1/8 × 12 = 1/96
10 men’s 1 day’s work = 1 × 10/96 = 5/48
1 woman’s 1 day’s work = 1/192
4 women’s 1 day’s work = 1/192 × 4 = 1/48
1 child’s 1 day’s work = 1/240
10 children’s 1 day’s work = 1/24
Therefore, (10 men + 4 women + 10 children)’s 1
day’s work = 5/48 + 1/48 + 1/24
=
8/48 =1/6
The required No. of days = 6 days. Ans.
Q.
90. 8
men can dig a pit in 20 days. If a man works half as much again a s a boy, then
4 men and 9 boys can dig a similar pit in:
(a) 10 days
(b) 12 days (c) 15 days (d) 16 days (e) None of these
Ans:
(d) 16 days
Explanation:
1 work done = 8 × 20
1 man = 3/2 Boys
1 boy = 2/3 men
Then, 9 boys = 9 × 2/3 men = 6 men
Then, 4 men + 9 boys = 10 men
Then, 8 × 20 = 10 × ?days
? days = 8 × 20/10 = 16 days. Ans.
Q.
91. A
man and a boy complete a work together in 24 days. If for the last 6 days man
alone does the work then it is completed in 26 days. How long the boy will take
to complete the work alone?
(a) 72 days
(b) 20 days (c) 24 days (d) 36 days (e) None of these
Ans:
(a) 72 days
Explanation:
(man + boy)’s 1 day’s work = 1/24
Their 20 day’s work = 1/24 × 20 = 5/6
The remaining 1/6 work is done by the man in 6days
Therefore, the man alone will finish the work in 6 ×
6 days = 36 days
Man’s 1 day’s work = 1/36
Therefore, boy’s 1 day’s work = 1/24 – 1/36 = 3 – 2
/72 = 1/72
Therefore, the Boy alone will finish the work in 72
days. Ans.
Q.
92. A,
B and C completed a piece of work costing Rs.1800. A worked for 6 days, B for 4
days and C for 9 days. If their daily wages are in the ratio 5 : 6 : 4, how
much amount will be received by A?
(a) Rs.800
(b) Rs. 600 (c) Rs.900 (d) Rs.750 (e) None of these
Ans:
(b) Rs. 600
Explanation:
The
new ratio = wages ratio × No. of days
A = 5 × 6 = 30
B = 6 × 4 = 24
C = 4 × 9 = 36
Therefore, the ratio of the amount received = 30 :
24 : 36 = 5 : 4 :6
Total ratio = 15
1 unit of ratio = 1800/15 = Rs. 120
Therefore, amount
received by A = 5 units = 5 × 120 = Rs.600. Ans.
Q.
93. 12
men take 36 days to do a work while 12 women complete 3/4th of the
same work in 36 days. In how many days 10 men and 8 women together will
complete the same work?
(a) 6 days
(b) 12 days (c) 27 days (d) Data inadequate (e) None of these
Ans:
(c) 27 days
Explanation:
1 man’s 1 day’s work = 1/ 36 × 12 = 1/432
10 men’s 1 day’s work = 10/432
12 women can finish the whole work in 4 × 36/3 = 48
days
1 woman’s 1 days work = 1/ 48 × 12 = 1/576
8 women’s 1 day’s work = 8/572 = 1/72
(10 men + 8 women)’s 1 day’s work = 10/432 + 1/72 =
10 + 6/432 = 16/432
= 1/27
Therefore, the required No. of days = 27 days. Ans.
Q.
94. A
is thrice as good a workman as B and therefore is able to finish a job in 60
days less than B. working together, they can do it in
(a) 20 days
(b) 22 ½ days (c) 25 days (d) 30 days (e) None of these
Ans:
(b) 22 ½ days
Explanation:
B = 3A
3A – A =60 days
A = 30days
Then, B = 90 days
(A + B) = 30 × 90/ 120 = 45/2 = 22 ½ days . Ans.
Q.
95. A
works twice as fast as B. if both of them can together finish a piece of work
in 12 days, then B alone can do it in
(a) 24 days
(b) 27 days (c) 36 days (d) 48 days (e) None of these
Ans:
(c) 36 days
Explanation:
B = 2A
2A × A/3A = 12
2A/3 = 12
A = 18 days
B = 2 × 18 =
36 days
Therefore, B alone can finish the work in 36 days. Ans.
Q.
96. A
man, a woman and a boy can complete a job in 3 days, 4 days and 12 days
respectively. How many boys must assist 1 man and 1 woman to complete the job in 1/4th of a day?
(a) 10 (b)
14 (c) 19 (d) 41
(e) None of these
Ans:
(d) 41
Explanation:
1 man’s 1 day’s work = 1/3, ¼ day’s work = 1/3 × ¼ =
1/12
1 woman’s 1 day’s work = ¼, ¼ day’s work = ¼ × ¼ = 1/16
1 boy’s 1 day’s work = 1/12, ¼ day’s work = 1/12 × ¼ = 1/48
Let ‘x’ be the No. of boys required.
Then, (1 man + 1 woman + x boy)’s ¼ day’s work 1/12 +
1/16 + x/48 = 1
= 4 + 3 + x = 1
48
i.e. 7 + x= 48 and x = 41. Ans.
Q.
97. A
does 4/5th of a work in 20 days. He then calls in B and they
together finish the remaining work in 3 days. How long B alone would take to do
the whole work?
(a) 23 days
(b) 37 days (c) 37 ½ days (d) 40 days
(e) None of these
Ans: (c) 37 ½ days
Explanation:
A can finish the whole work in 20 × 5/4 days = 25
days
A and B together finish the whole work in 5 × 3 days
= 15 days
Therefore, B can finish the whole work in 25 B/ 25 + B = 15
25 B =
15 ( 25 + B)= 375 + 15B
10B = 375 and B = 375/10 = 37 ½ days. Ans.
Q.
98. A can do 1/4th
part of the work in 10 days, B can do 40% of the work in 40 days and C can do
1/3rd of the work in 13 days. Who will complete the work first?
(a) A (b)
B (c) C (d) A and C both (e) None of these
Ans:
(c) C
Explanation:
The whole work is done by A in 4 × 10 = 40 days
B can do the whole work in 40/40 × 100 days = 100
days
C can do the whole work in 3 × 13 = 39 days.
Therefore, the 1st person to complete the
work is C. Ans.
Q.
99. A
alone can finish a work in 10 days which B alone can finish in 15 days. If they
work together and finish it, then out of a total wages of Rs.3000, A will get:
(a) Rs.1200
(b) Rs.1500 (c) Rs. 1800 (d) Rs.2000 (e) None of these
Ans:
(c) Rs. 1800
Explanation:
Ratio of working days of A : B = 10 : 15
Therefore, their wages ratio = reverse ratio = 15 :
10
Therefore, A
will get 15 units of ratio
Total ratio = 25
1 unit of ratio =3000/25 = 120
So, A’s amount = 120 × 15 = Rs.1800. Ans.
Q.
100. Directions: (Questions 1 to 5):
Each of the following questions consists of
a question followed by three statements I, II and III. You have to study the
question and the statements and decide which of the statement(s) is /are
necessary to answer the question.
1. In
how many days can A and B working together complete a job?
I.
A alone can complete the job in 30 days.
II.
B alone can complete the job in 40 days
III.
B takes 10 days more than A to complete
the job.
(a) I
and II only (b) II and III only (c) I and III only (d) Any two of the three (e) All I , II and
III
2. In
how many days can the work be completed by A and B together ?
I.
A alone can complete the work in 8 days.
II.
If A alone works for 5 days and B alone
works for 6 days, the work gets completed.
III.
B alone can complete the work in 16
days.
(a) I
and II only (b) II and III only (c) Any two of the three (d) II and either I or III (e) None of these
3. How
many workers are required to complete the construction work in 10 days?
I.
20% of the work can be completed by 8
workers in 8 days.
II.
20 workers can complete the work in 16
days.
III.
One-eighth of the work can be completed
by 8 workers in 5 days.
(a) I
only (b) II and III only (c) III only (d) I and III only (e ) Any one
of the three.
4. In
how many days can the work be done by 9 men and 15 women?
I.
6 men and 5 women can complete the work
in 6 days.
II.
3 men and 4 women can complete the work
in 10 days.
III.
18 men and 15 women can complete the
work in 2 days.
(a) III
only (b) All I, II and III (c) Any two of the three (d) Any one of the three
(e) None of these
5. In
how many days can 10 women finish the work?
I.
10 men can complete the work in 6days
II.
10 men and 10 women together can
complete the work in 3 3/7 days.
III.
If 10 men work for 3 days and thereafter
10 women replace them, the remaining work is completed in 4 days.
(a) Any
two of the three (b) I and II only (c) II and III only (d) I and III only (e) None of these
Answers
with explanations:
1.
Ans:
(d) Any two of the three
Explanation:
I.
A’s 1day’s work = 1/30
II.
B’s 1 day’s work = 1/40
III.
B’s 1 day’s work = 1/40
I
and II gives the answer,
I
and III gives the answer,
II
and III gives the answer,
Therefore,
the correct answer is (d). Ans.
2.
Ans:
(c) Any two of the three
Explanation:
I.
A’s 1 day’s work = 1/8
II.
1 work done = A’s 5 days work + B’s 6
day’s work
III.
B’s 1 day’s work = 1/16
So,
I and II gives the answer,
I and III gives the answer,
II and III gives the answer.
Therefore,
the correct answer is (c) .Ans.
3.
Ans:
(e) Any one of the three
Explanation:
I.
1 worker’s 1 day’s work = 1/320,
required No. of workers = 320/10 =32.
II.
1 worker’s 1 day’s work = 1/320
III.
1 worker’s 1 day’s work = 1/320
Therefore,
I alone gives the answer
II alone gives the answer
III alone gives the answer
Therefore,
the correct answer is (e). Ans.
4.
Ans:
(c) Any two of the three
Explanation:
I.
Gives, the linear equation 6x + 5y = 6
II.
Gives, the linear equation 3x + 4 y = 10
III.
Gives, the linear equation 18x + 15 y = 2
i.e.
Any two of the equations gives the correct answer.
Therefore,
the correct answer is (c) Ans.
5.
Ans:
(b) I and II only
Explanation:
I.
Gives, 1 man’s 1 day’s work = 1/60
II.
I and II gives 1 woman’s 1 day’s work =
1/80
III.
(10 men + 10 women)’s 1 day’s work = 1/7
Therefore,
I and II gives the answer
So, the correct
answer is (b). Ans. Solution to Mitul Sharma's Question on Time and Work
Question: A certain work can be done in a certain time by 25 men. With 5 men less it could have been done in 3 days more. In what time can it be done by 40 men.
Solution:
let x be the time taken by 25 men to complete the work in days.
Then, 25 * x = 20 * (x + 3)
25x = 20x + 60
x = 12
Then, 40 men will compete the work in = 25 * 12/40 = 15/2 = 7 1/2 days.
give solution
ReplyDeleteMay you please tell me the solution of the below question.
ReplyDeleteA certain work can be done in a certain time by 25 men. With 5 men less, it could have been done in 3 days more. In what time can it be done by 40 men.
This comment has been removed by the author.
Delete7.5 unit time
DeleteThis comment has been removed by the author.
ReplyDeleteans is 240 days
ReplyDeleteA,B,C can do peace of work in 12 day,if A does double work then B, then find in how many days C can finish whole work?
ReplyDeleteplease give solution
give the option?
DeleteA,B,C together complete work in 12 days, if A do double work as B, and C do 1/3 work of both A & B do, then in how many Day's C alone can do Work?
ReplyDelete48 days
Deletethe rate of working of A and B are in the ratio 3:4. the number of days taken by them to finish the work are in the ratio?? and how
ReplyDelete36 workman are employed to finish a certain work in 48 days.But it is found that in 24 days, only 2/5 work is done.How many more men must be taken to finish the work in time?
ReplyDelete36 workman are employed to finish a certain work in 48 days.But it is found that in 24 days, only 2/5 work is done.How many more men must be taken to finish the work in time?
ReplyDeleteans: 9
in 24 days---->2/5 work
Deletein 48 days---->4/5 work (by 36 workman)
so remaining work=> 1-4/5 =1/5
4/5 work----->36 man
1/5 work------>9 man,
total work---->(36 + 9) man
To complete a task, two men on the first day, three men on the second day and so on. If the same work can be completed by 9 men working for 15 days, in how many days will the work be completed in the earlier case?
ReplyDeleteA and B doing some work in 12 days,while b and c doing that work in 16 days,if a work for 5 days,then b works for 7 days,after that c works for 13 days,then it completes the whole work,tell the individual time for do that work by all three-
ReplyDelete1. 22 , 34 , 68
2. 24 , 48 , 16
3. 16 , 48 , 20
4. 16 , 48 , 24
A and B can complete their work in 5 days..A use his double efficiency and B use his half efficiency and complete their work in 4 days..in how many days A alone complete the work
ReplyDelete(A+B) x 5 = (2A+B/2) x 4
DeleteOn solving: A = B
Hence A can alone do the same work in 10 days.
hii
ReplyDeletesuper sir...
ReplyDeleteNice Shortcut methods to solve,
ReplyDeleteI Found one more link to solve Aptitude problems on time and work, tlwhis is also have excellent shortcut methods.
Click here to know shortcut methods
Plz solve this..!!
ReplyDelete4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete it?
As the work done is always the same, we can say that:
Delete(4M+6W) x 8 = (3M+7W) x 10
On solving this we find out that 1M = 11W
So in case of 4M and 6W, 4M can be replaced by 44W
50W can do that work in 8 days
so again:
50W x 8 = 10W x y
y= 40 days.
a and b can do a piece of work in 10 days b and c in 15 days c and a in 20 days.all of them work for 2 days and then a leaves.after 2 days b leaves.c will complete the work in?
ReplyDelete5 men or 12 boys can do a piece of work in 39 days.how many days will be taken by 16 men and 24 boys to do a work,which is twice as great as the original work?
ReplyDeleteplease solve this.....
ReplyDelete20 men take 10 days to complete a job working 12 hours a day. Find the number of men required to complete a job, twice as large, in 30 days working 8 hours a day?
240
ReplyDeleteProblems are sexist. You show that they always take longer to do the same job as a man.
ReplyDeleteProblems are sexist. You show that they always take longer to do the same job as a man.
ReplyDeletehttp://InvitenShare.com/?ref=80045
ReplyDeletehttp://InvitenShare.com/?ref=80045
ReplyDeletePrice of an article is increased by 3%, had it been Rs.16 less, price would have decreased by 1% of the original price. Find the original price of the article?
ReplyDeletePrice of an article is increased by 3%, had it been Rs.16 less, price would have decreased by 1% of the original price. Find the original price of the article?
ReplyDeleteplease help me to find answer
original cp= 400
ReplyDeleteTo do a certain work Q would take 2 times as long as P and R together and R takes 3 times as long as P and O together. The three man together complete the work in 15 days. How long would Q and R take to complete the work?
ReplyDeletePlease help me find the answer..
This comment has been removed by the author.
ReplyDeleteSohan can work for three hours non-stop but then needs to rest for half an hour. His wife can work for two hours but rests for 15 min after that, while his son can work for 1 hour before resting for half an hour. If a work takes 50 man-hours to get completed, then approximately how long will it take for the three to complete the same? Assume all of them all equally skilled in their work.
ReplyDelete*5 men and 15 women could do a work in 80 days. How long will it take to finish the work if 15 men and 12 women do the work on alternate days, starting from 15 men?*
ReplyDelete*5 men and 15 women could do a work in 80 days. How long will it take to finish the work if 15 men and 12 women do the work on alternate days, starting from 15 men?*
ReplyDelete
ReplyDeleteDO YOU WANT TO BECOME A GIGOLO?? WANT TO EARN BIG MONEY BY PROVIDING SEX SERVICES TO OUR FEMALE CLIENTS (INDIAN AND FOREIGN CLIENTS BOTH)..WE PROVIDE MALES TO ELITE CLASS FEMALES TO SERVE THEM..ONE OF THE OLDEST AGENCY FOR SUPPLYING MALE ESCORTS IN ALL BIG CITIES OF INDIA..EARNINGS VARY BETWEEN Rs 10000 TO Rs 12000 PER STAND...WE NEED MALES FROM ALL BIG 8874515399 CITIES OF INDIA..) FOR MORE INFORMATION JUST LOG ON TO gigolo job call boys play boy call me 8874515399 call me R CONTACT US DIRECTLY AT 8874515399
ReplyDeleteDO YOU WANT TO BECOME A GIGOLO?? WANT TO EARN BIG MONEY BY PROVIDING SEX SERVICES TO OUR FEMALE CLIENTS (INDIAN AND FOREIGN CLIENTS BOTH)..WE PROVIDE MALES TO ELITE CLASS FEMALES TO SERVE THEM..ONE OF THE OLDEST AGENCY FOR SUPPLYING MALE ESCORTS IN ALL BIG CITIES OF INDIA..EARNINGS VARY BETWEEN Rs 10000 TO Rs 12000 PER STAND...WE NEED MALES FROM ALL BIG 8874515399 CITIES OF INDIA..) FOR MORE INFORMATION JUST LOG ON TO gigolo job call boys play boy call me 8874515399 call me R CONTACT US DIRECTLY AT 8874515399
ReplyDeleteDO YOU WANT TO BECOME A GIGOLO?? WANT TO EARN BIG MONEY BY PROVIDING SEX SERVICES TO OUR FEMALE CLIENTS (INDIAN AND FOREIGN CLIENTS BOTH)..WE PROVIDE MALES TO ELITE CLASS FEMALES TO SERVE THEM..ONE OF THE OLDEST AGENCY FOR SUPPLYING MALE ESCORTS IN ALL BIG CITIES OF INDIA..EARNINGS VARY BETWEEN Rs 10000 TO Rs 12000 PER STAND...WE NEED MALES FROM ALL BIG 8874515399 CITIES OF INDIA..) FOR MORE INFORMATION JUST LOG ON TO gigolo job call boys play boy call me 8874515399 call me R CONTACT US DIRECTLY AT 8874515399
ReplyDeleteDO YOU WANT TO BECOME A GIGOLO?? WANT TO EARN BIG MONEY BY PROVIDING SEX SERVICES TO OUR FEMALE CLIENTS (INDIAN AND FOREIGN CLIENTS BOTH)..WE PROVIDE MALES TO ELITE CLASS FEMALES TO SERVE THEM..ONE OF THE OLDEST AGENCY FOR SUPPLYING MALE ESCORTS IN ALL BIG CITIES OF INDIA..EARNINGS VARY BETWEEN Rs 10000 TO Rs 12000 PER STAND...WE NEED MALES FROM ALL BIG 8874515399 CITIES OF INDIA..) FOR MORE INFORMATION JUST LOG ON TO gigolo job call boys play boy call me 8874515399 call me R CONTACT US DIRECTLY AT 8874515399
ReplyDeleteDO YOU WANT TO BECOME A GIGOLO?? WANT TO EARN BIG MONEY BY PROVIDING SEX SERVICES TO OUR FEMALE CLIENTS (INDIAN AND FOREIGN CLIENTS BOTH)..WE PROVIDE MALES TO ELITE CLASS FEMALES TO SERVE THEM..ONE OF THE OLDEST AGENCY FOR SUPPLYING MALE ESCORTS IN ALL BIG CITIES OF INDIA..EARNINGS VARY BETWEEN Rs 10000 TO Rs 12000 PER STAND...WE NEED MALES FROM ALL BIG 8874515399 CITIES OF INDIA..) FOR MORE INFORMATION JUST LOG ON TO gigolo job call boys play boy call me 8874515399 call me R CONTACT US DIRECTLY AT 8874515399
ReplyDeleteCOLL NOW 09818592392call COLL BOY PLAY BOY SEX SERVICE GIGOLO इस में बड़े घरानों की महिलाएं अपने साथ सेक्स करने के लिए युवा लड़कों को पैसे देती है उसे जिगोलो कहते हैं इन लड़कों से सेवाएं लेने वाली महिलाएं अमीर अय्याश महिलाएं भी बड़े घरानों की होती है जो एक बार के 16000 से 26000 हजार रुपए देती है अगर आप भी जिगोलो बन कर पैसे कमाना चाहते हैं तो जल्द ही हम से संपर्क करें COLL NOW 09818592392call COLL BOY PLAY BOY SEX SERVICE महिलाओं की उम्र 20 से 45 वर्ष SEX SERVICE समय एक सप्ताह में दो से तीन लड़कियों या महिलाओं को SEX SERVICE देना होता है माश्र दो से तीन घंटे स्थान आप के शहर से 50 से 100 किलोमीटर के आस पास बड़े शहरों में फाइफ स्टार होटल या उनके बंगले पर अब डरने और शरमाने का समय नहीं है अब MALE और FEMALE हर एक मीटिंग में 16000 से 26000 कमाओं और अपनी जिंदगी के हर एक पल का मजा लो HIGH SOCIETY के लड़के और लड़कियों के साथ आप के आप ने ही CITY में आज ही ज्वाइन होने के लिए काल करें COLL NOW 09818592392call COLL BOY PLAY BOY SEX SERVICE दोस्तों फेसबुक पर आप को कोई हाउसवाइफ सीधा संपर्क नहीं करेंगी वो सुरक्षा चाहतीं हैं प्राइवेसी चाहतीं हैं इसलिए वो कंपनियों के जरिए मिलेगी SEX SERVICE में आप को अमीर घरों की लड़कियों महिलाओं के साथ दोस्ती SEX सम्बंध बना कर उन्हें खुश करना होता है यह वह महिलाएं होती हैं जिनके HUSBAND अक्सर उनसे दूर रहते हैं इसीलिए उन्हें अपनी शारीरिक जरूरत पूरी करने के लिए GIGOLO COLL BOY PLAY BOY की आवश्यकता होती है वह GIGOLO COLL BOY PLAY BOY को इसीलिए बुलाती है क्यों की वह वदनामी के डर से आस पड़ोस में सम्बंध नहीं बनाती है इसीलिए वह GIGOLO COLL BOY PLAY BOY को बुलाती है क्यों कि GIGOLO COLL BOY PLAY BOY उन को नहीं जानते है और ना ही उन का घर क्यों कि मीटिंग होटल में होती है GIGOLO COLL BOY PLAY BOY SERVICE में मिलने वाला वेतन आप को एक मीटिंग का 16000 से 26000 रुपये हर मीटिंग का मिलेगा आपको पहली मीटिंग का 25% कमीशन देना होगा और आप को बाकी सभी मीटिंगों का 50% कमीशन मीटिंग के बाद कंपनी को देना होगा आप अपनी इच्छानुसार किसी भी टाइम की मीटिंग लें सकते हैं यह GIGOLO COLL BOY PLAY BOY SEX SERVICE भारत के सभी छोटे बड़े शहरों में उपलब्ध है आप अपनी इच्छानुसार किसी भी शहर में GIGOLO COLL BOY PLAY BOY SEX SERVICE लें सकते हैं जिस दिन आप की रजिस्ट्रेशन SERVICE फीस जमा होगी पहली मीटिंग उसी दिन होगी JOIN होने के लिए नीचे मांगी गई DETAILS WHATSAPP 09818592392call पर भेजे आप को अपना कोई भी एक आई डी देना होगा और एक पासपोर्ट फोटो देना होगा और जिस शहर में SERVICE करना है उस का नाम WHATSAPP करो और आज हमारे साथ हजारों MALE FEMALE काम कर रहे हैं 100% गोपनीय COLL NOW 09818592392call COLL BOY PLAY BOY SEX SERVICE